
Product Details
About This
- Sturdy and Durable Metal: The 5 tiers shoe rack is made of sturdy and smooth powder coated metal tubing with corrosion resistant and high quality plastic connectors. Stable, each shelf can hold up to 11 pounds and has a long service life.
- More large space:This expandable shoe rack holds up to 20 pairs of shoes. You can remove one layer to put boots or other large items. Besides shoes, this modern shoe racks can hold hats, books, bags, small accessories, and sundries for maximize your space!
- Multifunctional: The black shoe rack cabinet has hanging hooks that allow you to hang commonly used items on the side hooks such as umbrellas, belts, keys, bags, hats, shopping bags, rackets, etc
- Product Dimension: The size of 35.6"x12.2"x35.03",Put in the kitchen can be placed in the kitchen utensils and tableware. In the entrance can keep clean and tidy. The shelf in the bedroom can put miscellaneous things in the closet to keep clothes neat and tidy. Make the miscellaneous room look cleaner.
- EASY TO ASSEMBLE: No tools needed,Free standing shoe racks includes instruction manual,You can have it assembled about 5 minutes, if you have any questions about the process, please do not hesitate to contact us at any time
Overview
- Material : Metal
- Mounting Type : Floor Mount
- Room Type : Bedroom, Closet, Hallway
- Shelf Type : Tiered Shelf
- Number of Shelves : 5
- Special Feature : Adjustable
- Product Dimensions : 35.6"D x 12.2"W x 35.03"H
- Shape : Rectangular
- Style : Modern,Adjustable,Versatile
- Finish Type : Powder Coated
How long does shipping take?
Orders are typically processed and shipped within 3-5 business days. Please note that shipping times may vary slightly depending on the specific product. If there are any unexpected delays with your shipment, our team will proactively reach out to you via email.
What is your return and exchange policy?
We want you to love your home organization solutions! If you need to make a return or exchange, please contact us within 30 days of receiving your item. Just make sure to include your receipt (or order screenshot) and a photo of the unused product with its original packaging and tags intact.